Description:Installation of a Double Fume hood, Casework and associated piping
Notes:The fume hood was installed as one unit using several pieces of lifting equipment. The delivery date of the fume hood became the critical path to the construction schedule. The end result was minimal down time for the end user.
Sq Footage:N/A
Start Date:2005
End Date:2005
Architect:N/A
Budget:$65 000
Owner:Bristol-Meyers Squibb
38 Jackson Rd, Deven, MA 01435