WORK OVERVIEW

  • Client Name: Bristol-Meyers Squibb
  • Location: Billerica, MA
  • Description: Installation of a Double Fume hood, Casework and associated piping
  • Notes: The fume hood was installed as one unit using several pieces of lifting equipment. The delivery date of the fume hood became the critical path to the construction schedule. The end result was minimal down time for the end user.
  • Sq Footage: N/A
  • Start Date: 2005
  • End Date: 2005
  • Architect: N/A
  • Budget: $65 000
  • Owner: Bristol-Meyers Squibb
    38 Jackson Rd, Deven, MA 01435